Case Study - Bowmer and Kirkland Tesco, Lichfield

  • Retail

Partnering with Bowmer & Kirkland for a Tesco store project, we helped complete this contract ahead of schedule.  It was one of the first projects where McDermotts began to develop sustainable practices whilst working towards the ISO 14000 accreditation. Most of the materials used on site were of a recycled nature.

 

The project was built on the footprint of an existing store, which involved working closely, with the demolition contractor, to ensure safe working practices. The works included carrying out a bulk cut and fill exercise, creating a level working platform across the site, for the demolition, piling and our works. We installed reinforced concrete base foundations, reinforced concrete retaining walls, external concrete yards, storm drainage system including a swale, hard landscaping with memorial structures and service diversions. We were also responsible for creating and maintaining all access roads around the site, to a live petrol station and pharmacy ensuring safe passage for the general public.  The project completed in 26 weeks with a value of  £1.15 m.

 

Download this case study

Tesco, Lichfield

 

Gallery

Lichfield Tesco-4640 Lichfield Tesco-4681 Lichfield Tesco-4645 Lichfield Tesco-4672 Lichfield Tesco-4633 Lichfield Tesco-4634 Lichfield Tesco-4661 Lichfield Tesco-4637 Lichfield Tesco-4651 Lichfield Tesco-4648 Lichfield Tesco-4627 Lichfield Tesco-4630 Lichfield Tesco-4674 Lichfield Tesco-4676 Lichfield Tesco-4667