Working with Wates Construction as part of the Stoke BSF this project involved the construction of a new external covered amphitheatre, an extension to an existing building with a new covered corridor between buildings and internal alterations to existing toilet blocks and changing rooms.


The complex amphitheatre involved the formation of a new tiered structure, foundations for a steel canopy and high specification paving’s with step units. The project required careful planning, due to its proximity within a live school with only one access point and the challenging programme. We overcame this challenge by our deployment of our Project Manager. Through his leadership and innovative solutions, such as thermoplastic strips on treads which saved valuable time, we were able to deliver the project successfully, both on time and within budget. The sub-contract works were valued at £200,000.         

Download this Case Study

Download PDF

 

Gallery

Trentham School-6410 Trentham School-6419 Trentham School-6401 Trentham School-6389 Trentham School-6400 Trentham School-6415 Trentham School-6398 Trentham School-6384 Trentham School-6390 Trentham School-6441 Trentham School-6388 Trentham School-6413 Trentham School-6433 Picture3 Trentham School-6421